Skip to main content

Core domain chart

Following the ddd-crew Core Domain Charts: each subdomain is placed by model complexity (x) and business differentiation (y). The classification is not decided here — it is the one already recorded in Subdomain classification: workforce-management is Supporting. This chart only shows where inside the Supporting quadrant it sits, and why.

Source: classification from docs/docs/ddd/subdomain-classification.md (table "The original five contexts, for comparison"); this context's position from internal/domain/** (aggregate and invariant count) and docs/docs/adr/*.md. Omits: the six later fleet contexts (their classifications are owned by their own repositories), and any numeric precision — the coordinates are relative placements, not measurements.

Quadrant numbering follows Mermaid: 1 = top-right (Core), 2 = top-left (Decisive / Short-term Core), 3 = bottom-left (Supporting), 4 = bottom-right (Generic). The four sibling points are shown only for scale, using the classifications this repository's own subdomain page assigns them.

Why this position​

Differentiation: low (y ≈ 0.3). The fulfillment DDD reference calls labor management "important, industry-common". Nothing in this codebase is an optimiser, a heuristic or a scoring function; rebalancing is a human decision that this context only records (ADR 0002). The platform differentiates in wes-work-planning (continuous release and flow balancing), inventory-storage and fulfillment-execution, not here.

Complexity: moderate, below the midpoint (x ≈ 0.4). Evidence from the code:

SignalValueWhere
Aggregate roots3 — AssociateShift, ShiftPlan, LaborAssignmentinternal/domain/{associate,shiftplan,assignment}
Domain invariants enforced in pure Go11 rejecting errors across the three roots, 4 of them named in the Definition of DoneInvariants, Aggregate design canvas
Status enums / state machinesnone — state is two booleans (onBreak, ended) and one optional intervalassociate_shift.go, labor_assignment.go
Cross-context reads that shape a decision2 — live installed capacity (fail-loud) and measured rate / idle share (fail-open)ADR 0014, ADR 0012, ADR 0020
ADRs32 — most about integration and operability, not domain modellingADR index

The complexity that exists is about correctness (structural single active assignment, two independent capacity ceilings, certification gating), not about a rich or novel model. That is what keeps it left of the midpoint while still above the trivial corner.

Supporting, not Generic​

A Generic subdomain is one you could buy. This one is too tied to the platform's process-path vocabulary — path families resolved by prefix through the process-path catalogue, path-name-equals-certification-name gating, installed capacity counted per station capability — for an off-the-shelf labor product to fit without a translation layer wider than the service itself. That is the same argument Subdomain classification makes, and why the point stays in quadrant 3 rather than drifting right.

Evolution​

On the Wardley evolution axis (genesis → custom-built → product → commodity) this context is product: labor allocation against a fixed path catalogue is a well-understood problem, solved the same way across the industry, and the investment here goes into enforcing well-known rules correctly. Two parts are closer to custom-built: the idle-share proposal trim (ADR 0020) and the live installed-capacity ceiling (ADR 0014), both specific to how this fleet wires its contexts together. Neither moves the context out of Supporting; they make it a better-fitting Supporting context.

What would move it​

  • An automated rebalancer (an AssignmentOptimizer in the reference model's terms) would raise both differentiation and complexity and push the point toward quadrant 1. Context relationships names this as the first relationship that would need revisiting.
  • Replacing the process-path vocabulary with a generic skills/roster model would push it toward quadrant 4.