Domain vision
Admit work onto the floor continuously in deadline order, correcting the flow from live buffer telemetry — so that every parcel makes its truck without the floor ever being starved or flooded. (Turning a shift's charge into a committed plan moved to warehouse-planning, ADR-0049.)
That is the whole job. The platform-level vision it serves, from the reference model, is:
Fulfil customer orders from many disparate SKUs at massive scale by receiving goods, storing them under chaotic storage, and reliably picking, packing, and shipping them along the fastest/cheapest path — continuously re-optimising physical work in real time.
The phrase that matters for this context is "continuously re-optimising physical work in real time." In the reference model that is the heartbeat of the core domain, and it is exactly the slice this service owns.
The conductor metaphor
The industry framing that this platform follows describes a WES as the conductor that decides which activities happen when, while the WCS is the specialist that ensures the equipment performs them, and the WMS is the system of record that says what must happen and why.
Concretely for this service:
- WMS says: "900 units for the 18:00 truck, 500 more for the 21:00 truck,
all on the pick path." → arrives as a work unit per order line, each with its
CPT. The shift's forecast and its heads per path (6 heads on
pick-aat 95 units/hour for 8 hours) are warehouse-planning's since ADR-0049. - This service decides: release
wu-2next because its CPT is 18:00 andwu-1's is 21:00; the pool is at its WIP limit with backlog remaining, so flag a headcount move. - Downstream execution does: turn the released unit into a claimable task and put it in front of an associate or a machine.
Three boundaries this context refuses to cross
The value of the boundary is what it keeps out. Each of these is a decision, not an omission.
It does not own inventory truth
Whether a SKU is physically available is inventory-storage's job. This
context keeps a read-only, SKU-keyed projection of what Inventory last
reported (UsableInventoryObserved) and nothing more. If it tried to own
usable quantity, two systems would disagree about stock during every network
partition, and the disagreement would be invisible until a picker found an
empty bin.
Nor does it own product classification: product-master does. This context
keeps a version-guarded local copy of product-master's ProductClassified
events, used only to stamp fail-open hazmat/fragile hints on released
work (ADR-0035).
It does not assign individual people to individual tasks
Headcount planning per process path lives in workforce-management;
individual task dispatch lives in fulfillment-execution. This service
stops at the path boundary: it says "this path needs more heads", never
"Maria goes to station 3."
The reference model is explicit about why: if the planning tier acquires knowledge of individual workers, real-time location and walking routes, then a supporting concern (labour orchestration) has leaked into a system that must stay stable and auditable, and every shift-pattern change forces a regression in the wrong place.
It does not talk to equipment
No PLC, no conveyor, no robot. Releasing work is an admission decision, and admission decisions are made in units of work, not in units of actuator commands.
Why "charge", not "demand"
The word is chosen deliberately. Charge is the volume that must clear, bucketed by CPT. "Demand" or "orders due today" flattens the staircase into a single number, and the moment you flatten it you can no longer tell whether you are on track: a path that has cleared 60 % of the day's volume may be perfectly on plan or may have already missed the 18:00 truck, and only the CPT bucketing distinguishes those two worlds.
Why a process path is a queue, not a step
A process path in this model is a named station that owns a queue — unit-in → unit-out, a service rate, a staffed capacity — not a stage in a workflow. This matters because the interesting questions are queueing questions: how deep is the backlog, is arrival rate above service rate, is this buffer starving or flooding? A workflow-step model cannot express any of those; a queue model expresses all of them, which is what makes flow balancing possible at all.