0040. Plan approved slot plans as sequenced RELOCATE work

Status​

Accepted.

Implements this context's part of fleet decision E1 (slotting-optimization ADR 0010, "Approved slot plans are executed as WES relocation work", which supersedes slotting-optimization ADR 0007) and follows decision E5 (the process-path catalogue declares which demand sources may route work onto a path; process-path-management ADR 0034).

Context​

slotting-optimization publishes SlotPlanApproved (com.warehouse.wms.slotting-optimization.slotplan.SlotPlanApproved, dataschema urn:warehouse:slotting-optimization:events:SlotPlanApproved:v1) on warehouse.slotting-optimization.events, key and subject = the plan id. Its data carries plan_id, site_id, approved_at, an optional supersedes_plan_id, the full assignments map and the moves that change the site's forward-slot picture. Each move is {sku, from_slot?, to_slot?, kind} where kind is Assign (no from_slot), Relocate (both) or Vacate (no to_slot).

A move is physical floor work: an operator carries the SKU's stock from one bin to another. The fleet already has one conductor for floor work. This context plans and pools it, process-path-management routes it, fulfillment-execution runs it with operators (its ADR 0047, task type RELOCATE), and inventory-storage records the result on the ledger from fulfillment-execution's TaskCompleted. Decision E1 makes approved slot plans a second demand source next to orders, beside the network transfer legs of ADR-0033.

ADR 0007's open questions are answered by decision E1; the parts this context owns are:

  • Sequencing (answer 4). Inside one plan, a move INTO a slot that another move of the same plan vacates must wait until that vacating move's task has completed. Otherwise the operator finds the destination slot still full.
  • Supersession (answer 3). When a newer plan for the site is approved, the superseded plan's work that has not been released yet is cancelled and the new plan's moves are planned. Released or in-progress work runs to completion.
  • Quantity (answer 5). v1 moves the whole on-hand quantity of the SKU at the source bin, counted and confirmed by the operator at execution, so the plan carries no quantity and neither does the work unit. The open side of an Assign (source) or a Vacate (destination) is chosen and scanned by the operator at execution.

Decision​

  1. A sixth consumed topic. The inbound Consumer also reads warehouse.slotting-optimization.events (cloudevents.TopicSlottingEvents) under the same consumer group, with its own <topic>.dlq writer (RequiredAcks: RequireAll, like every DLQ writer). Only SlotPlanApproved is handled; SlotPlanGenerated, SlotPlanRejected and any unknown type are ignored.

  2. ApplySlotPlanApproved, beside ApplyWorkDemandReleased. One use case applies one plan, with the processed-event mark (the CloudEvents id) and every write in ONE atomic scope (ADR-0028). Nothing leaves except through the transactional outbox (ADR-0014).

  3. One RELOCATE work unit per move.

    • id <plan_id>-move-<move_seq>, where move_seq is the move's 0-based index in moves (deterministic, so a replay under a new event id is a no-op);
    • reference = plan_id, so GET /work-units?reference=<plan_id> lists every unit of a plan;
    • path RELOCATE, validated against the process-path catalogue (ADR-0012). When the catalogue entry declares an intake (process-path-management ADR 0034) it must contain SLOT_RELOCATION; an entry without an intake is accepted, because this route is chosen by explicit path id;
    • work_kind = RELOCATE, site_id = site_id, sku = sku, plus the relocation value: plan_id, move_seq, kind, from_slot, to_slot;
    • cpt = approved_at + RELOCATION_CPT_HORIZON (default 24h): a slot plan has no customer cutoff, but every pooled unit needs a CPT, and fulfillment-execution's CPT-miss sweep must not flag a fresh move as already late.
  4. Sequencing: a blocked unit stays out of the pool. Move B waits on move A when A.from_slot == B.to_slot (A is not B, same plan). B is created Pending with blocked_by = A's work unit id and is NOT admitted to the RELOCATE work pool, so no release (REST, MCP) can hand it out. When A's completion is recorded (TaskCompleted from fulfillment-execution, already consumed by ApplyTaskCompleted, or POST .../completions), RecordCompletion admits every Pending unit blocked by A into the pool in the SAME transaction and clears its blocked_by. Two rules keep this total:

    • when several moves vacate the same slot (a valid plan has at most one), B waits on the one with the lowest move_seq;
    • a dependency cycle (a swap: X→Y and Y→X) is broken at its lowest move_seq: that move is planned unblocked. The floor holds two SKUs in one bin for the duration of the swap, which the ledger allows.
  5. Supersession is decided per site by approval time. A slot_plans row records every plan this context has applied (plan_id, site_id, approved_at, supersedes_plan_id, move_count). For an incoming plan P at site S:

    • P already recorded: no-op (the same plan under another event id);
    • the latest recorded plan of S was approved AFTER P (ties: the greater plan_id wins): P is stale. Plan ids are Kafka keys, so two plans of one site may arrive out of order. P is recorded and plans nothing;
    • otherwise P supersedes: every Pending RELOCATE unit of S that belongs to another plan (blocked or pooled) is cancelled. The unit moves to the new terminal state Cancelled and its pool entry is withdrawn (WorkPool.Withdraw). Then P's units are planned. Released and Completed units are never touched. supersedes_plan_id is recorded for audit only; the rule does not depend on it, so a missed intermediate plan cannot leave work behind.
  6. Release goes through the existing flow. RELOCATE units are released by ReleaseNextWork on path RELOCATE, exactly like every other pool. A pooled entry whose unit was cancelled is withdrawn on the way past, never released. WorkReleased stays v1. For a RELOCATE unit its data gains ONE optional object, present only on RELOCATE units:

    "relocation": {
    "plan_id": "plan-3b0e8d2a",
    "move_seq": 1,
    "kind": "Relocate",
    "sku": "SKU-2",
    "from_bin": "WH1-FWD-A02-03-01-A",
    "to_bin": "WH1-FWD-A01-01-02-A"
    }

    from_bin is omitted for an Assign and to_bin for a Vacate (the operator scans the open side). kind keeps the slotting spelling. This is the shape fulfillment-execution's WorkReleased consumer turns into its RelocationMove (ADR 0047 there); its completion reports relocation_ref = "<plan_id>:<move_seq>". The transfer fields of ADR-0033 (work_kind, transfer_ref, site_id, quantity) remain the transfer discriminator and are NOT emitted for RELOCATE units, so fulfillment-execution's transfer branch never sees a relocation.

  7. Fail loud on a broken contract. A SlotPlanApproved with no plan_id, site_id or approved_at, a move with no sku, an unknown kind, a kind missing the slot it requires, a Relocate whose two slots are equal, an unknown RELOCATE path or an intake that excludes SLOT_RELOCATION is deterministic poison: the handler returns an error, the message is retried and then dead-lettered to warehouse.slotting-optimization.events.dlq. A message interrupted only by shutdown cancellation is never dead-lettered (the consumer's existing ctx.Err() guard).

  8. No cancellation event in v1. A cancelled unit was never released, so no downstream service holds work for it. Its cancellation is visible on the work-unit read API (state: Cancelled, cancelledAt). A WorkUnitCancelled event can be added later if a consumer needs one.

Consequences​

  • RELOCATE work is staffed, capacity-planned and measured like every other path: labour plans, WIP limits, release telemetry and the analytics counters apply unchanged.
  • The work-unit read side (GET /work-units/{id}, GET /work-units?reference=) shows Cancelled, cancelledAt, the relocation value and blockedBy. The WorkUnitState enum gains Cancelled. Cancelled is terminal: Release and Complete refuse it.
  • Migration 0014 is additive: relocation columns on work_units (all NOT NULL DEFAULT except the nullable cancelled_at), two partial indexes, and the slot_plans table.
  • New env RELOCATION_CPT_HORIZON (Go duration, default 24h).
  • warehouse-infra: no change is required for this context. The consumer joins the existing KAFKA_CONSUMER_GROUP, and the topic is slotting-optimization's own publish topic, so its ensure-topics entry already exists wherever slotting-optimization runs. The RELOCATE path must be in the process-path catalogue (process-path-management's seed) before plans arrive, or they are dead-lettered until it is (replay from the DLQ; see the runbook).

Alternatives considered​

  • A blocked flag inside the pool entry (a held entry state) — rejected: every pool reader (backlog depth, WIP, remaining capacity) would need to learn a state that means "not really backlog". Keeping blocked units out of the pool keeps the pool's meaning "releasable work".
  • Sequencing in fulfillment-execution — rejected: release order is this context's job; fulfillment-execution would have to hold tasks it was told to run.
  • Supersession driven only by supersedes_plan_id — rejected: one lost or out-of-order event would leave a superseded plan's work in the pool forever. Approval time per site is total and order-independent.
  • A separate relocation aggregate — rejected for the ADR-0033 reason: a move is the same releasable unit of work with extra descriptive context.