ADR-0006 — Project ShiftPlanCommitted into LaborPlanObserved, not into our ShiftPlan

Status​

Amended by ADR-0049 (2026-11-18): the ShiftPlan half moves to warehouse-planning; the LaborPlanObserved projection described here stays.

Accepted.

Context​

workforce-management publishes ShiftPlanCommitted when a human commits a split of headcount across process paths, one message per path line:

{"building_id": "BLD1", "shift_id": "S1", "path_id": "pick-a",
"planned_heads": 7, "planned_rate": 95.5, "planned_hours": 8}

This service has an aggregate called ShiftPlan, containing PathPlan lines with plannedHeads, rate and hours.

Same name. Nearly the same fields. The obvious implementation is to feed the event into CommitShiftPlan and be done.

That would be the classic DDD mistake. The strategic reference names it directly:

Same word, different model is allowed — and expected. Task in WMS and Task in WES are deliberately different classes with different lifecycles. Don't force a shared DTO/entity across the boundary; translate at the ACL.

The two models genuinely differ:

Workforce's ShiftPlanOur ShiftPlan
What it isA labour commitment: which associates, which paths, direct vs indirect hours, one per building per shiftThis context's own throughput decision: rate × heads × hours on a path
Ownsassociates, certifications, breaks, assignmentsthe plannedHeads ≤ installedStations invariant
Concept of "installed stations"none — it does not model physical station countscentral; it is the invariant's right-hand side
Who may change ita human in Workforcethis service's CommitShiftPlan use case
Lifecyclecommitted at shift start, revised intra-shiftcommitted by us, then read by release and rebalance

Three concrete failures follow from merging them.

  1. An external system could violate our invariant. Workforce has no installedStations and no reason to respect it. A planned_heads: 12 event for a path with 8 stations would either be rejected — meaning we drop a fact Workforce has already committed and is entitled to commit — or accepted, destroying the invariant. Neither is acceptable.
  2. Our commit logic would be coupled to their publish cadence. Every Workforce revision would silently overwrite a decision this context made.
  3. The failure would be invisible. No compiler and no test catches "these two ShiftPlans are the same thing", because from a distance they look identical. The only defence is a deliberate boundary.

Decision​

We will project ShiftPlanCommitted into a new, separate, read-only type called LaborPlanObserved, and it will never touch the ShiftPlan aggregate or the CommitShiftPlan use case.

  1. A new package, internal/domain/laborview, holding a plain value:

    type LaborPlanObserved struct {
    PathId shared.PathId
    PlannedHeads int
    PlannedRate float64
    PlannedHours float64
    ObservedAt time.Time
    }

    Exported fields, no constructor, no validation, no behaviour. That shape is the decision made visible: this type protects nothing, because the facts in it are owned by another bounded context and we are not entitled to reject them. Compare PathPlan, which has private fields and a validating constructor because its rule is ours.

  2. Deliberately different names. Not ShiftPlanView or ExternalShiftPlan — LaborPlanObserved. A reader who sees it beside ShiftPlan should have to ask why, and get this answer.

  3. Its own port, table and endpoint. LaborPlanViewRepo with memory and Postgres adapters, a labor_plan_view table joined to nothing, and GET /paths/{pathId}/labor-plan-view — returning 404 when nothing has been observed, so "no observation" is distinguishable from "observed zero".

  4. Idempotent projection. The event_id is checked against processed_events before writing, so redelivery does not re-write the row.

  5. Additive context only in RebalanceDecision. The response may carry the projection as an extra field. The decision logic does not consult it, and the existing rebalance tests were unchanged by adding it.

The same reasoning produced UsableInventoryObserved for Inventory's events — keyed by SKU, not by path, because Inventory reservations are SKU-scoped and a SKU-to-path mapping does not exist in the domain. Forcing one for the sake of consistency with our other endpoints would have produced a projection wrong in a way no test could catch.

Consequences​

Easier​

  • Our invariant is inviolable from outside. No external event can reach PathPlan's constructor.
  • Both facts are available side by side. "We planned 6 heads; Workforce committed 7" is answerable, and it is genuinely useful next to a ReassignLabor recommendation — which is exactly why the projection appears as context on that response.
  • Workforce's schema can change freely. Its payload struct is unexported inside our inbound Kafka adapter; nothing downstream of the ACL knows its shape.
  • The read model is trivial. No invariants means no invariant tests, no migration risk from a rule change, and a table with no foreign keys.

Harder​

  • Two similar types in one codebase. ShiftPlan, PathPlan, LaborPlanObserved — a newcomer will ask whether the third is redundant. This ADR is the answer, and it needs to keep being given.
  • Nothing enforces the separation. No test fails if someone wires the consumer into CommitShiftPlan. It is a convention, defended by naming, package boundaries and this record. (The arch-go fitness tests enforce layering, not semantic boundaries.)
  • Duplication is now permanent. Both models carry planned heads and rate. They will drift, and drift is the correct outcome — but it will look like a bug to someone.
  • Reconciliation is out of scope. Nothing detects that we planned 6 while Workforce committed 7. The data is exposed; noticing is a human's job today.
  • The name is longer. LaborPlanObserved reads awkwardly next to ShiftPlan. Accepted: awkwardness that prompts a question is cheaper than familiarity that hides one.