20. Network-originated demand — release-on-allocation as an intake choice, deadline feasibility, and the Network promise basis
Status
Accepted (2026-09-23). Companion to network-fulfillment ADR 0001 (the bounded
context that speaks a major e-commerce retailer's vendor platform API and owns the
acknowledgement clock). Neither is meaningful without the other: this
record adds three narrow capabilities to this service that have no
caller until that context exists, and that context cannot honour a
24-hour fill-or-kill acknowledgement deadline without them. Raised
together so the boundary can be accepted or rejected as one decision.
This ADR deliberately adds no knowledge of a major e-commerce retailer, purchase orders,
ASINs or acknowledgement codes to this service. If a reader finds any of
that vocabulary in internal/domain/order after this ships, the
boundary has been violated — see §5.
Context
ADR 0014
replaced now + leadTime with a promise derived from real fulfillment
capability, and Phases 0–6 shipped it end to end
(ADRs 0015–0019). The promise this service makes is now a discrete CPT
window it selects: PromisePolicy.Promise answers "what is the
earliest cutoff every allocated line can make?", tagging the result
Capability or LeadTime via order.PromiseBasis.
Every order this service has ever received has arrived through
POST /orders from a caller with no opinion about when it ships. The
promise is therefore always a free choice, and the intake flow reflects
that: since ADR 0005 the use case is a folded, best-effort saga —
receive, allocate, release — completing inside the one call. The
OpenAPI description states it plainly: "allocates and releases
automatically".
A second class of demand is now in scope. In a network-originated fulfilment relationship — a retail network sending demand to a warehouse it does not own — three facts are true that have never been true here:
- The deadline arrives with the demand. The order carries a required ship-by instant set by the network. The promise is not selected; it is given, and the only question this service can answer is whether the building can meet it.
- Commitment precedes work. The network requires an explicit accept/reject decision, and measures the accepting party on the gap between what was accepted and what actually shipped. Work must not start before that decision is made and sent.
- It is whole-order or nothing. The accept/reject decision covers every line together. There is no "we'll send you three of the five".
Fact 1 is a small addition: the same three inputs PromisePolicy
already consults (CapabilitySource, ScheduleSource,
CapacitySource) answer "is any cutoff at-or-before T feasible?" as
readily as they answer "which cutoff is earliest?". It is the dual of a
question this service already answers well, and that it can be asked at
all is a good sign the ADR 0014 model was cut at the right joint.
Facts 2 and 3 collide with shipped behaviour, and those collisions are the substance of this record.
Collision A: there is no state between allocated and released
ReceiveOrder releases every eligible allocated line in the same call.
For network demand that is backwards — it commits work to the floor
before this fleet has told the network whether it accepts the order.
The only recovery available today is to release and then cancel, and
ADR 0004 is explicit
that release is the cancellation boundary: past it, this service
cannot claw work back, a gap that record documents honestly rather than
papering over. Optimistic release would therefore make every rejection
an unrecoverable one, and would do so by deliberately crossing a line an
earlier ADR drew on purpose.
The aggregate already distinguishes Allocated from Released — the
states needed exist and are tested. What is missing is a way for a
caller to stop between them.
Collision B: per-shipment-group promising is exactly wrong here
ADR 0017 extended
AllowPartialShipment from "may release lines separately" to "may
promise lines separately", grouping lines by the cutoff each can make
and giving each group its own Promise (order_promise_groups, and
the additive per-line promise_cpt_id/promise_basis/
promise_cutoff_at fields on ReleasedLine). That is the right domain
rule for a customer buying a book and a bag of dog food.
Under fact 3 it is precisely the wrong rule: a whole-order accept/reject
decision cannot be expressed as several promises, and an order split
across two cutoffs has no single answer to give. Nothing in the code
prevents a network order from being received with
allowPartialShipment: true today, and the failure would be silent and
external — accepted, then partially shipped, then penalised by the
network. This needs to be an invariant, not a convention.
What this service must NOT absorb
The pull is to model the network relationship here, since this is where orders live. That would be wrong on the fleet's own established grounds:
- A major e-commerce retailer's vendor platform API is a Conformist upstream: this fleet
has exactly zero influence over its contract. Its vocabulary
(
purchaseOrderNumber,itemSequenceNumber,buyerProductIdentifier,acknowledgementStatuscodes,sellingParty/shipFromParty) is not ours and must be translated, not adopted. - Network orders carry customer PII — ship-to name, address, phone — behind restricted-data authorisation. No context in this fleet holds PII today. Introducing it into the aggregate that four other contexts already read would be the single largest blast-radius decision available, made for the narrowest reason.
- The 24-hour acknowledgement clock is an external SLA. This service has no SLA-bearing responsibilities and should not acquire one.
So: the network relationship is a bounded context of its own
(network-fulfillment, its ADR 0001), and this record is the minimal,
additive set of capabilities it needs from here.
Decision
1. releaseOnAllocation — an additive intake flag, default true
ReceiveOrder gains an optional request field:
releaseOnAllocation boolean, default true
When true (the default, and therefore every existing caller and every
existing test) behaviour is byte-identical to today: receive,
allocate, release, publish OrderAllocated/OrderPartiallyAllocated.
The folded saga of ADR 0005 is untouched.
When false, the use case stops after allocation. Lines reach
Allocated and stop there; OrderAllocated is still published — the
allocation genuinely happened and inventory-storage genuinely holds
reservations — but no line is released, so wes-work-planning sees no
work. A promise is computed and attached at allocation time exactly
as today; a caller holding an unreleased order can therefore read the
promise and decide.
A second, small use case completes the pair:
ReleaseHeldOrder(orderId) — releases the already-allocated lines of an
order received with releaseOnAllocation=false
It reuses the existing release leg of allocation.go rather than
reimplementing it, and is a no-op returning success for an order whose
lines are already released (idempotent — the caller may be retrying
after a network failure and must not be punished for it).
Because the hold state is "allocated but not released", cancellation before release keeps working unchanged, and ADR 0004's boundary is respected rather than circumvented: a rejected network order is cancelled on the correct side of the line, reservations are revoked through the existing path, and no work ever reached the floor.
This is deliberately a domain-neutral capability. It is described in terms of allocation and release — concepts this service already owns — and is useful to any future caller that must decide before committing. Nothing about it names a network.
Amendment (2026-09-23, during implementation): the hold intent is persisted
This record originally claimed the hold needed no storage, because "allocated but not released" is expressible in the line statuses the aggregate already owns. That is wrong for the partially-allocated case, and implementing it surfaced the hole.
A held order can have a backordered line. When stock arrives,
RetryAllocation allocates it — and a held order whose lines are
Allocated-but-not-Released is indistinguishable, by line status
alone, from an ordinary ship-complete order that BR3 held back while it
waited for that same stock. Without stored intent, retry releases the
order, putting work on the floor for demand nobody has committed to:
precisely the failure the hold exists to prevent, arriving by the one
path nobody was watching.
So orders.release_on_allocation BOOLEAN NOT NULL DEFAULT TRUE is added
(migration 0005), and callers pass o.ReleaseOnAllocation() into the
allocation flow rather than a literal. The intent is read from the
aggregate, which is what makes a later pass — triggered by a different
caller, minutes or hours afterwards — behave correctly.
Three details worth keeping:
- The aggregate field is stored as its inverse (
heldAtIntake). Go's zero value for a bool isfalse, and every existing constructor, test literal andRehydratecall site leaves the field unset; storingreleaseOnAllocationdirectly would make all of them silently produce held orders — failing in the worst direction, as work that never reaches the floor. release_on_allocationis deliberately absent from theINSERT … ON CONFLICT DO UPDATE SETlist. The hold is an intake fact; a laterSave(e.g. after release) must never rewrite it.ReleaseHeldOrderdoes not clear the flag. It records what the order was received as, not where it is now — line statuses already carry current state. Clearing it would erase the order's history and destroy exactly the retry-safety it was added for.
DEFAULT TRUE keeps this additive: every pre-existing row, and every
caller that never sends the field, is unchanged.
2. PromisePolicy.FeasibleBy(deadline) — the dual of Promise
PromisePolicy gains one method alongside Promise:
// FeasibleBy reports whether some CPT window at or before deadline can
// be made by every allocated line, and which window that is.
func (p PromisePolicy) FeasibleBy(now time.Time, o *Order, deadline time.Time) (Promise, bool)
It consults the same CapabilitySource, ScheduleSource and
CapacitySource, applies the same three per-line conditions ADR 0014 §2
states (path in the cutoff's eligiblePathIds;
now + cycleTimeP95 <= cutoffAt; capacity unknown or sufficient), and
returns the latest qualifying window at or before deadline — the
one that leaves the floor the most slack while still meeting the
commitment, which is the correct choice when the date is fixed and
cannot be improved by shipping earlier.
Where Promise falls back to LeadTimePolicy, FeasibleBy returns
ok=false. This asymmetry is intentional and is the single most
important line in this record: "we could not determine feasibility"
and "we can meet your deadline" must never be the same answer.
Promise falls back because a building that cannot say when is still
a building that will ship (ADR 0014's own words). FeasibleBy cannot
borrow that generosity — a guess here becomes an external commitment
this fleet is measured against. Missing schedule, unknown cycle time,
empty horizon: all false.
Promise is not modified. Its tests remain valid.
Amendment (2026-09-23, phase 4): the deadline reaches intake
Phase 2 added FeasibleBy and stopped there, which left this record
describing a method nothing in the service ever called. POST /orders
accepted no deadline, so the only way to reach it was a domain unit test.
network-fulfillment discovered this the moment it tried: its ADR 0001
§7 says feasibility is asked of order-management, and there was no
way to ask.
Intake therefore accepts an optional requiredShipBy:
orders.required_ship_by TIMESTAMPTZ NULL(migration0006), nullable with no default, because "no deadline" is the overwhelming majority and must stay distinguishable from "a deadline at the zero instant" — the latter would make every ordinary order look infeasible.Order.requiredShipByis a*time.Timefor the same reason, set via aSetRequiredShipBymutator rather than a fourthRehydrateparameter (the chain is alreadyRehydrate/RehydrateWithGroups/RehydrateHeld; widening it again costs every call site an argument it does not care about).allocationDeps.setPromiseDateroutes on it: a deadline present meansFeasibleBy, absent meansPromiseGroupsexactly as before.
An infeasible order is left with no promise at all, and is still
created, still allocated, still returned 201. "We cannot make your
date" is an answer, not a rejection — and an optimistic promise we
already know breaks the deadline would tell the caller we can do
something we cannot, when finding that out is their entire reason for
sending a deadline.
The deadline is persisted rather than passed transiently for the same
reason the hold is (§1's own amendment): a later RetryAllocation
re-promises, and a deadline that did not survive the round trip would
silently drop back to the ordinary earliest-window promise and break the
external commitment with no trace.
Amendment (2026-10, ADR-conformance audit): re-promise honours the deadline too
The routing above was applied at intake and in RetryAllocation, but
RepromiseOrder (ADR 0018) called PromiseGroups unconditionally. A
Network-basis order hit by TaskCPTMissed/PackageManifested was
therefore re-promised on the Capability/LeadTime basis — possibly past
the deadline, and silently flipping promiseBasis away from Network.
RepromiseOrder now routes exactly like setPromiseDate: an order with
a persisted requiredShipBy is recomputed by FeasibleBy (single
ship-complete group, Network basis, latest qualifying window at or
before the deadline). When the deadline is no longer feasible
(FeasibleBy → false), the existing promise is kept and no
OrderRepromised is published — the same "no promise we know breaks the
deadline" outcome as intake.
3. PromiseBasis gains a third value: Network
BasisNetwork PromiseBasis = "Network"
A Network-basis promise is one whose CutoffAt was dictated by an
external deadline rather than selected by this service. CptId is
populated — the window FeasibleBy selected is a real departure from
the site's schedule — but the promise itself was not this service's free
choice.
This is the same discipline ADR 0014 already applies in distinguishing
Capability from LeadTime, extended one step: ADR 0019's promise-KPI
read model must not average a dictated promise together with a derived
one, or the promise-to-cutoff-gap and basis-distribution metrics become
meaningless the day network demand starts flowing. The basis is
recorded on the existing promise_basis wire field and needs no schema
change beyond accepting the new value.
4. Network-originated orders are ship-complete, enforced
An order received with releaseOnAllocation=false and
allowPartialShipment=true is rejected at intake with a 422. The two
are contradictory: a caller that needs to decide before committing is
by definition making one decision for the whole order, and per-group
promising (ADR 0017) would give it several answers where it can only
send one.
Stating it as an aggregate-level invariant rather than a convention in
the caller is what makes it hold. The alternative — trusting
network-fulfillment to always pass false — fails the first time
someone "improves" network orders by enabling split shipments, and
fails externally, where this fleet is penalised for it.
5. The boundary, stated so it can be checked
This service, after this ADR:
- knows an order may arrive with a deadline and may be held before release;
- does not know what a purchase order, an ASIN, an acknowledgement code, a selling party or a marketplace is;
- stores no customer PII. Network orders reach
POST /orderswith SKUs and quantities. The ship-to identity stays innetwork-fulfillmentand reaches the carrier label from there.
The existing arch-go fitness test
(internal/architecture/architecture_test.go) already forbids adapter
and infrastructure types in the domain. It does not, and cannot, forbid
a vocabulary leak. That check is a human one, and this section is the
statement it checks against.
Alternatives considered
- Release optimistically, cancel on rejection. No new intake flag;
reuse
cancelOrder. Rejected: ADR 0004 makes release the cancellation boundary and documents the no-clawback gap as a known limitation. This would convert that documented gap into a routine operational event, and would do it to satisfy an external party's deadline — the worst possible reason to cross a boundary an earlier decision drew deliberately. - Let
network-fulfillmentcompute feasibility itself. It has the deadline, and could consume the same three Kafka-fed caches. Rejected: that duplicates ADR 0014's promise math in a second repo, where it would drift. The promise is this service's responsibility — the same reasoning ADR 0014 used to reject moving promise computation intowes-work-planning, which likewise had the data. - A
Heldorder status. More explicit than "allocated and not released". Rejected: it adds a state to an aggregate four contexts read, and to every consumer's exhaustive status handling, to express something the existingAllocated/Releasedpair already expresses exactly. The status enum should describe where the work is, not why. - Reuse
BasisCapabilityfor deadline-driven promises. Smaller enum. Rejected: it silently corrupts ADR 0019's KPIs, which exist precisely to keep different kinds of promise separable. - A
delivery-orchestrationbounded context now. ADR 0014 named this as the genuine production shape and deferred it. Still deferred: this record adds two methods and a flag, which does not justify a service whose only aggregate isPromise. If this service ever splits,PromisePolicyandFeasibleBylift out together, unchanged — which is the property worth preserving.
Consequences
Easier
- Demand can be allocated without being committed, which any external channel needs and which this fleet has never been able to express.
- Feasibility against a fixed date is answerable from capability data the fleet already publishes, with no new synchronous edge and no new promise math.
- A dictated promise stays analytically distinguishable from a chosen one, so promise KPIs survive the arrival of network demand.
- Rejection is clean: cancel before release, reservations revoked through the existing path, no work on the floor, ADR 0004's boundary intact.
Harder
ReceiveOrdergains a second outcome shape. Its tests must now cover the held path, and "allocated but not released" becomes a state that can persist indefinitely if a caller crashes between allocation and its decision. A held order holds real inventory reservations —network-fulfillmentowns the acknowledgement clock that bounds this, but an orphaned hold is a new way for this service to sit on stock, and nothing here sweeps it. This is a real gap, recorded as one.FeasibleBy's no-fallback rule means it returnsfalsewhenever the CPT schedule cache is cold — including during the startup window ADR 0014 already accepted for the catalogue caches. Early in a restart, network orders are rejected rather than mispromised. That is the correct trade and it will still look like a bug to whoever sees it first.- A third
PromiseBasisvalue means every exhaustive switch on basis — in the projector, the report, the MCP tools — must handle it. The compiler will not catch a missing case on a string-typed enum. - The 422 on
releaseOnAllocation=false+allowPartialShipment=trueis a new intake rejection, and its error body is a contract.
Deliberately out of scope
- Everything that speaks to a network: polling, acknowledgement codes,
transaction-status reconciliation, advertised availability, shipment
confirmation. All of it is
network-fulfillmentADR 0001. - Sweeping orphaned holds. Named above as a real gap; the natural owner is the context holding the SLA clock.
- Site modelling. ADR 0014 §"SiteId is a known simplification" still
stands — every promise is computed against one configured site, and
FeasibleByinherits that unchanged.
Accepted deferral (2026-10 ADR-conformance audit). The audit re-flagged the missing orphaned-hold sweeper. It is deliberately not implemented in order-management: a hold's lifetime is bounded by the acknowledgement clock
network-fulfillmentowns, so the sweeper's correct trigger and timeout live there, and a second, independent TTL here would race it. Until a sweeper exists, an orphaned hold keeps its inventory reservations until someone callsDELETE /orders/{id}(BR6-legal while nothing is released) orPOST /orders/{id}/releases. Tracking: open a follow-up innetwork-fulfillment("sweep orphaned holds past the acknowledgement window by calling order-management's cancel") — this is an accepted limitation, not an unowned one.
Rollout
Each step is its own feature branch and PR into develop, CI green
before merge, in this order:
- This ADR and its companion, accepted together (docs only).
- This service:
BasisNetwork, thenPromisePolicy.FeasibleBywith its own table-driven tests including the no-fallback cases. Pure domain, no wire change, no caller. - This service:
releaseOnAllocation+ReleaseHeldOrder+ the ship-complete invariant, with the OpenAPI regeneration that anyapis/openapi.yamlchange requires. network-fulfillmentbuilds against the shipped shape (its own ADR 0001's rollout).e2e-tests: a scenario proving a held order reachesAllocatedand produces no work inwes-work-planning, and one proving a deadline earlier than the earliest feasible cutoff yieldsFeasibleByfalse rather than a fallback promise. Neither can pass by accident.
Addendum 2026-11-13: current state
- The orphaned-hold sweeper that the "Accepted deferral" note above asks for exists, in network-fulfillment:
SweepOrphanedHolds(internal/application/usecases/sweep_orphaned_holds.gothere, its ADR 0024, accepted 2026-10-17) cancels a hold nobody decided onceacknowledgeByplusORPHAN_HOLD_GRACEhas passed, throughDELETE /orders/{id}(internal/adapters/outbound/ordermanagement/planner.go). - order-management still has no sweeper of its own, as decided here: the deferral stands, and the tracked follow-up is done.