Core domain chart
The ddd-crew Core Domain Chart plots a subdomain on two axes: business differentiation (how much competitive advantage it gives) and model complexity (how much domain logic it carries). Top-right is Core; top-left is Decisive / short-term Core (differentiating but simple, often a quick win that erodes); bottom-left is Supporting (simple and undifferentiated — build it cheaply); bottom-right is Generic (complex but solved elsewhere — buy or reuse it). The classification here must agree with Subdomain classification: Fulfillment Execution as a whole is Core. The chart also plots its internal slices, because the subdomain classification page classifies the slices separately (Picking is Core; Packing and SLAM are Supporting), and the neighbours it depends on, for contrast.
Source: docs/docs/ddd/subdomain-classification.md,
internal/domain/task/task.go, internal/domain/package/package.go,
internal/domain/package/segregation.go,
internal/domain/consolidation/order_consolidation.go,
internal/analytics/, internal/application/ports/equipment.go.
Positions are a judgement, not a measurement; the evidence for each is
below. Omits the upstream and downstream bounded contexts (each charts
itself in its own repository).
Why it sits where it does
| Item | Quadrant | Evidence |
|---|---|---|
| Fulfillment Execution (the context) | Core | Classified Core on Subdomain classification: the WES tier is Core when operational efficiency is the differentiator and this platform builds its own execution layer; Picking is Core outright. Four aggregate roots (Task, Station, Package, OrderConsolidation) enforcing 17 numbered invariants, each with a failing-path test (Aggregates & invariants); 115 domain unit tests; 10 Gherkin feature files; arch-go fitness tests; mutation testing on ./internal/domain/task. |
| Task dispatch and lease | Core, top-right | The differentiating policy: pull-based claimNext with CPT ordering (ADR-0002), at-most-once leases (ADR-0003), a compare-and-set claim save (ADR-0034). Six task invariants (T1–T6) and the largest test file (task_test.go, 41 tests). |
| Rebin consolidation | Core, lower | Fan-in of an order's lines before Pack (ADR-0016). Small model (2 invariants) but on the throughput path, and it needs per-order serialization (advisory lock + FOR UPDATE). |
| Pack and segregation | Supporting | Packing is Supporting per the reference model. The model is not trivial — live DOT hazard lookups and a 49 CFR §177.848-derived segregation matrix (ADR-0010) — but the rules are industry-standard, not a differentiator. Cartonization is absent on purpose. |
| SLAM weigh-check | Supporting | Reduced to one invariant (Package.Weigh within WeightTolerance = 0.05); no carrier integration, no manifest generation. |
| Analytics read side | Generic | Throughput and on-time-to-CPT projections (cmd/fulfillment-projector, cmd/fulfillment-reports, ADR-0012, ADR-0026): counters per hour bucket, no domain rules. The machinery (separate database, idempotent projector, freshness endpoint) is real work, but it is standard analytics plumbing. |
| WCS equipment control | Generic | Real equipment control is complex, but "device-agnostic control is a largely solved integration category." ports.EquipmentCommandPort declares no methods and has no adapter (ADR-0015). |
Evolution
On a Wardley-style evolution axis (genesis → custom-built → product → commodity):
- Task dispatch and lease: custom-built. The behaviour is stable and tested, but it is specific to this platform's pull model and is still being extended (claim compare-and-set, lease sweep and CPT sweep are recent ADRs). Nothing here is bought.
- Rebin consolidation: custom-built, early. Added late (ADR-0016), its two events are not yet published, and the Pack task is created from caller-supplied parameters.
- Pack segregation and SLAM: moving toward product. The rules come from regulation and standard practice. If the platform ever adopted a vendor pack-station or SLAM line, these would be the first slices to give up.
- Analytics and WCS: product / commodity. Projections are plain counters; equipment control would be bought and integrated behind the anti-corruption seam.
The chart therefore predicts what the code already shows: investment (tests, ADRs, invariants) concentrates on dispatch and lease, and the Supporting slices stay deliberately thin.